Mechanical Contract Value: £160,000.00
Main Contractor: John Perkins Construction Ltd
Program: 32 weeks

Scope of works

MJD are pleased to have been involved in the refurbishment and extension of Kingswood School, fusing the historic building with a modern extension to create new and improved living quarters. The project run by John Perkins Construction consists of 26 bedrooms, plus bathrooms and ample social space, all completed to a high spec finish.

MJD were responsible for the full design, supply, installation and commissioning of all mechanical works including:

  • 2no Vailliant eco tec plus wall mounted system boilers, with a combined output of 110kws connected to low loss header servicing a new boarding house & existing boarding house.
  • Stelrad Compact radiators complete with Danfoss thermostatic and lock-shield valves fitted throughout.
  • Hot and cold water services to sanitary ware fed from 1no Andrews EC230/960 water heater.
  •  Ventilation system, consisting of Vent Axia Quadra SELB low carbon fans.

Testimonials

"MJD have undertaken the mechanical works on several projects I have managed and are currently carrying out the upgrade, refurbishment and new build at Gloucester road Medical Centre, I have always found MJD to be very professional and proactive, there engineers are reliable and conscientious there work is very clean and methodical, wherever possible I will use MJD on future projects, I would recommend MJD for all types of mechanical works."

Kevin Campbell MD Group

"Over the past four years, I’ve had the pleasure of working with MJD on numerous decarbonisation projects, and they’ve consistently proven themselves to be a reliable and highly skilled partner. Their team brings a wealth of expertise in both mechanical and electrical services, always delivering work of the highest standard. Whether it’s a complex installation or a fast-paced refurbishment, MJD approaches every task with professionalism, attention to detail, and a proactive mindset. Their commitment to quality, safety, and client satisfaction has made them an invaluable part of our project delivery team. I look forward to continuing our successful partnership."

Frankie Corrado HI GROUP

"I am now on our second project with MJD; their family-run business has a wealth of knowledge with experienced and specialised staff. The supportive professional approach was provided by dedicated staff who provided support and technical know-how to get it right the first time. The design development, from stage 3 drawings to problem-solving, was some of the best I have experienced in many years. My first project with MJD was a complicated project in a live school in London, where expectations of the design were huge and constantly being changed. The team were vigilant in their installation and quality control, resolving issues as they occurred with a partnering/ teamwork approach to the finished product. I have never experienced such a complicated compact plant room, only possible due to the hard work of MJD. My current project with them is now drawn and well-coordinated with other trades and the structure. I wouldn’t hesitate to recommend them as a valued asset to any team"

Steve Burton Feltham Construction